4 An organisation has the following total costs at two activity levels: Activity level (units) 17,000 22,000 Total costs (£) 140,000 170,000 Variable cost per unit is constant in this range of activity and there is a step up of £5,000 in the total fixed costs when activity exceeds 18,000 units. What is the total cost at an activity level of 20,000 units? A £155,000 B £158,000 C £160,000 D £163,000
C |